ECUA Interim Materials Recovery Facility

Location: Pensacola, FL
Client: Emerald Coast Utilities Authority
Cost: $197,000
Completion Date: September 2016
Services:
  • Conceptual Site Plans
  • Surveying
  • Permitting
  • Foundation Designs
  • Utilities Design/Coordination
  • Construction Administration
  • Construction Observation
Market: Environmental
ECUA Interim Materials Recovery Facility

BDI was hired to provide professional services for the development of the Interim Materials Recovery Facility (IMRF) at the Perdido Landfill.  The project will include construction of a 50,000 square foot facility to house the materials recovery equipment and provide storage for bailed product similar to the facility that was previously designed for the CWRF.