University of West Florida Football Facility

Location: Pensacola, FL
Client: University of West Florida
Cost: $3.2 Million
Completion Date: 2016
Services:
  • Sitework Design
  • Surveying
  • Competition Field
Market: Civil
University of West Florida Football Facility

For years, the University of West Florida has talked about a football program. In 2016, a competition field by Astro-Turf was installed.  Baskerville-Donovan provided site design and construction plans for the earthwork, drainage, utilities, grassing and irrigation.  Included in our efforts were provisions for a future athletic complex, utility corridor, and stadium seating.

Approximately 31,000 CY of material was moved to build the competition field on the 9-acre site.