BDI was hired to provide professional services for the development of the Interim Materials Recovery Facility (IMRF) at the Perdido Landfill. The project will include construction of a 50,000 square foot facility to house the materials recovery equipment and provide storage for bailed product similar to the facility that was previously designed for the CWRF.